Appendix A – M24 Fluokit Disposal Procedures. Fluokit Indoor Ring Main Units contain Sulphur Hexafluoride (SF6) gas as an insulating medium which is. AIR INSULATED SWITCHGEAR. FLUOKIT M+ MV modular switchgear up to 24kV. Technical Specifications. AREVA T&D. Summary. Cubicle equipment. FLUOKIT M+ cubicles include the following features: Operating Cubicles in the FLUOKIT M+ range all have functional . Fluokit M24 & M24+ meets your.

Author: Mazushakar Vikree
Country: Georgia
Language: English (Spanish)
Genre: Life
Published (Last): 18 August 2016
Pages: 93
PDF File Size: 3.56 Mb
ePub File Size: 7.22 Mb
ISBN: 328-7-48222-236-4
Downloads: 90772
Price: Free* [*Free Regsitration Required]
Uploader: Manris

Particular instructions for operation and intervention with energized equipment When commissioning and operating the equipment under normal conditions, the General safety instructions for electrical applications must be respected, protective gloves, insulating stool, etc.

FLUOKIT M24+ – Schneider Electric

The other brand names mentioned within this document, whether they be copyright or not, belong to their respective holders. Next, discover our energy and sustainability services, including big data management, to turn this vision into your business reality. Preparation of the frame in profile sections. It is therefore generally installed on the side of the road.

This document has been printed on ecological paper Publishing: For these specific cases, contact the Schneider Electric Sales Department.

Altitude of the connecting points in relation to the cable flanges other than mounting base. Access to the substation Substation access must remain free at all times and under any circumstances. Responsibilities Our devices are quality controlled and tested at the factory in accordance with the standards and the regulations currently in force. It is necessary for anchoring the profile sections to the floor. Floor openings under the Functional Units 6. M12x30 hook bolt 8.

  ALPINE KTX 100EQ PDF

Preventive maintenance of the circuit breaker part Please refer to specific instructions See page 4. Apparatus efficiency floukit apparatus life depend on the compliance with the installation, commissioning and operation instructions described in this user manual. Pouring the cement top coat Block off the irons to avoid penetration of cement into the rail.

ECOFIT Fluokit M24/FP

The room must be equipped with standardised high level and low level ventilation. On the un-surfaced exposed concrete, pour a top coat of smooth finish, without ballast. Installing the Functional Units to the floor. Symbols and important safety informations.

The interventions described are carried out on de-energized equipment in the course of being installed fluoklt locked out non operational. Its thickness must be about 40mm of cement dosed at kg of CPA.

Painted sheet steel 2 mm thick. Schneider Electric request the carefully reading of the following instructions in order to familiarize yourself with the product in this document before trying to install, operation, put into service or conduct the maintenance on it. These are carried out by Schneider Electric or by a specialised technician, trained by Schneider Electric in the implementation of procedures, fliokit who is equipped with specific equipment.

No ducts of any kind must pass through the substation’s immediate environment without special protection sheaths or ducts. Our products are fully quality controlled and tested at the factory in accordance with the standards and regulations currently in force. It offers optimum and flexible switchboard configuration for every electrical scheme with the highest safety.

Layout on a type 2 cable trough, with width of more than 50cm Whenever the width of the cable trough exceeds 50 cm, it is necessary to fit the longitudinal support irons to support the left and right-hand uprights for each Functional Unit.

  FRECKLEFACE STRAWBERRY PDF

Schneider Electric, the Schneider Electric logo and their figurative forms are Schneider Electric registered trademarks. Also prevent any penetration by small animals such as rodents, snakes, lizards, etc. Case of a type 2 cable trough. Local safety requirements which are in accordance with these instructions, especially m42 regarding the safety of product operators and other site tluokit, must be observed.

The durations for completing the operations mentioned given in the maintenance tables are purely an indication and depend on on-site conditions. Symbols of information 06 Code for a product recommended and marketed by Schneider Electric 21 Nm Tightening torque value Example: Installation of the switchboard. Reserve opening for connecting the earthing cable.

The interventions described are carried out on de-energized equipment in the course of being installed or locked out non operational. Definition of the substations. Pouring the cement top coat On the un-surfaced m4 concrete, pour a top coat of smooth finish, without ballast. A direct exposure can lead to excessive overheating of the low voltage racks.

FLUOKIT M+ 24kV

It will be the reference point for levelling the irons. Complete this assembly by the lateral irons. They are routed along a cable trough or trench or through floor openings.