HUAWEI BTS3900 INSTALLATION MANUAL PDF

0 Comment

BTS GSM Installation Guide(V_13).pdf – Download as PDF File .pdf), and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd. What is a base station installation guide 1) Introduction to base stations BTS Installation Guide for Enhancing Existing Cabinets ( Registering for a free account gives you a number of additional benefits, including access to additional valuable information that you can browse or download.

Author: Akinogal Yozshujin
Country: El Salvador
Language: English (Spanish)
Genre: Politics
Published (Last): 2 March 2009
Pages: 301
PDF File Size: 12.83 Mb
ePub File Size: 11.16 Mb
ISBN: 156-4-94929-648-5
Downloads: 75465
Price: Free* [*Free Regsitration Required]
Uploader: Meztilkis

Page 50 Step 8 Test the insulation between the base and the expansion bolt. This chapter only describes the procedure for installing components in the BBU. Unpacking The Equipment The total number does not tally with the Find out the cause and report any missing packing list articles to the local Huawei office.

The cabinet can be installed with one side against the wall. The total number does not tally with the Find out huawfi cause and report any missing packing list articles to the local Huawei office. Remove the dustproof caps from the optical connectors at the end labeled 1A and 1B on the fiber optic cables, and insert the optical connectors into the optical installaion in BBU 1.

The armor of the AC cable need to be grounded. Skip to main content.

Reset Password

Enter the email address you signed up with and we’ll email you a reset link. Use a screwdriver to tighten the screws on the wiring terminals.

  1998 HONDA CIVIC OWNER MANUAL PDF

In this scenario, two 80A input power cables are used for upper and lower shelves. To print the manual completely, please, download it.

Keep redundancy when cutting the cable tie. Compared with 03no information is deleted. If DC power cables need to be routed on the tower platform, lay out the cables on the guardrail with the shortest distance and route the cables along the guardrail.

If the current temperature is out of the range, make protection measures or route the cables again. Connected to the PGND cable.

Page 6 Press the keys in turn.

Welcome to Our Website

C Installation Guide 06 This is the sixth official release. Compared with issue 05this issue adds the following contents: To meet customer requirements, we supply various installaton guides, which are listed as follows: Page 84 Step 5 Use a screwdriver to tighten the screws on the wiring terminals. Prerequisites The input power cables are correctly and securely connected.

Document Preparations This section describes the reference documents that must be ready before the installation. The other end is already connected. This document describes how to install hardware for a running base station. Step 4 Test the insulation between the base and the expansion bolt.

Procedure Step 1 Determine the position of the cabinet by referring to the marking template, as shown in Figure Raise the puller on the optical module. This section describes the reference documents that must be ready before the installation.

  LA ENCHILADA COMPLETA PATRICIO PDF

Before the installation, pay attention to the following items: CPRI fiber optic cables are routed out of the cabinet through the nearer left or right cable outlet. Ensure that the heads of all the cable ties are outside the cabling teeth, as shown in Figure Step 5 Use a level to check the cabinet level, as shown in Figure Restructuring This document describes how to restructure the existing base station to support capabilities of new base stations while saving site space.

Wireless Network Info Community Members: Installation Guide for Capacity Expansion This installation guide plays great emphasis on impacts of new component installation on the running base station. Decompose the expansion bolt assemblies, and check whether insulating washers are missing or damaged.

Huawei BTSA Installation Guide V1 5 | Pradeep Liyanage –

Indoor centralized rack icr dual-mode base station pages. Optional installing A Cpri Optical Fiber The performance of an optical module that is exposed to the air for more than 20 minutes may be abnormal. Insgallation the lower cabinet and remove the cover Step2: